Just bought and fitted the above side steps. Very pleased with them appear well built. After reading on here about fitting times of around 40 min one side 30 mins other. Anyhow 5 hours later job done. I suppose if you are prepared to drill multiple holes in the floor covering then not a big job but trying to remove the covering takes a little longer. The instructions were very comprehensive thats if you consider 4 pictures of a different model car to be so.
One my neck ache and shoulder ache and blooded hands have healed i will enjoy them to the full
ive bought the Bragan stuff before for my discovery sport, they were identical to the landrover ones, i believe these ones are too.. i think they somehow get them from the factory, Bragan are over the water so maybe that is how.
I didn't have to drill any holes as such they located in the existing holes. It was the underfloor covering that was the problem. Some YouTube videos show the installer just cutting a hole in the underfloor covering to access the main anchor points. I removed the covering fitted the brackets then refitted the covering a few cuts were necessary but not too much. Hope that makes sence.
You cannot create new threads in this forum You cannot reply to threads in this forum You cannot edit your posts in this forum You cannot delete your posts in this forum You cannot vote in polls in this forum